AI Indexes
Finance AI Index
Index › Products › Oracle Primavera Cloud · October 2026 Edition
Oracle · 1 category · Named, not ranked

Oracle Primavera Cloud

3Judge labels
1First choices
1Negative labels
3 / 14Models named it
1Category
October 2026 Edition. Every number here is derived from the raw labels under vendor table v2026-10.7, every buyer segment counted.
Standing
1 label, too few to rank
A product needs 10 labels in a category before a share or quadrant is stated. Oracle Primavera Cloud was named 1 time in Corporate performance ma, where Planful led with 22%. The labels and the evidence are below, counted exactly.
By buyer segmentRead the same way at every buyer size.
In corporate performance ma · each standing computed within its segment · bars are 0 to 100 · the accent bar is the product's own best reading

Standing by category

Every category where a model named Oracle Primavera Cloud for a mid-market B2B company. Share is first choices across the direct, paraphrase, budget and scale prompts; rank is within every product named in that category.
CategoryFunctionShareRankNegative rateLabelsQuadrantSince September 2026
Corporate performance managementPlanning and analysis0%64 of 990%1under 10 labels · led by Planful at 22%newNew since September 2026: not ranked then, 0% now.

Movement

Since September 2026, Oracle Primavera Cloud held within the floor in its one category: no change cleared 10 points.

Best category · Corporate performance ma · by segment

Mid-marketnewNew since September 2026: not ranked then, 0% now.
0%from 0% in September 2026
Inside the floor by 10 pointsRank 60 of 91, unchanged
EnterprisenewNew since September 2026: not ranked then, 2% now.
2%from 0% in September 2026
Inside the floor by 8 pointsRank 9 of 69, unchanged

All categories · Mid-market

CategorySeptember 2026NowChangeReadingRank
Corporate performance ma0%0%newNew since September 2026: not ranked then, 0% now.New this editionRank 64 of 99, unchanged

Shares here are read over the models both editions asked, so they can differ by a point or two from the standing above, which counts every model in this edition.

The floor is 10 points of share, measured: how far the models move a leader on their own when the same questions are asked twice with nothing changed. A larger change is movement; a smaller one is noise, and both are shown. Movement is read over the twelve models both editions asked; GPT-6 Luna, Muse Glimmer 30B joined this edition and are in the standing but not yet in the comparison. How the floor is measured · The editions

By model

How each model treated Oracle Primavera Cloud across every prompt where it was named for a mid-market B2B company. Fourteen models, six prompts per category.
ShowHide
ModelFirst choiceAlternativeMentionNegativeLabels
Claude Haiku 4.500101
GPT-5.4 mini00000
Gemini 3.5 Flash00000
Perplexity Sonar00000
Grok 4.1 Fast00000
Mistral Small00000
DeepSeek V4 Flash00000
Llama 4 Maverick00000
Qwen 3.7 Flash00000
Kimi K200000
GLM 4.7 FlashX00000
MiniMax M2.500000
GPT-6 Luna00000
Muse Glimmer 30B00000

By framing

Which of the six questions produced the naming. By model says how often; this says asked what. The first-choice count on the right carries the marks of the models that produced it.
FramingLabels by classFirst choices
Direct0 labelsNone
Paraphrase1 labelNone
Comparative0 labelsNone
Budget-constrained1 label1
Scale-constrained1 labelNone
Negative0 labelsNone
First choiceAlternativeMentionNegative3 labels in all, every segment counted; 1 of the 1 first choices count toward share, since the comparative and negative framings do not. The bar is one segment per label class, to scale within the framing.

What the models said for it

Verbatim evidence the judge attached to positive labels.

No positive label carried a quote.

And against it

Verbatim evidence attached to negative labels. A warning on a product with few labels is a warning; on a product with many, it is one voice among them.

No model argued against it.

Named alongside

The products named in the same answers as Oracle Primavera Cloud, over the 3 answers that named it. Took the first choice instead counts the answers where the other product was the first choice and Oracle Primavera Cloud was named but was not.
ShowHide
ProductSame answerTook the first choice insteadHead to head
Kantata1 of 31Not among the top eight
Asana for Enterprise1 of 30Not among the top eight
BigTime1 of 30Not among the top eight
CCH Tagetik1 of 30Not among the top eight
Deltek Costpoint1 of 30Not among the top eight
Microsoft Project Online1 of 30Not among the top eight
Microsoft Project Operations1 of 30Not among the top eight
Microsoft Project for the Web1 of 30Not among the top eight
Microsoft Project with Project Server/cloud1 of 30Not among the top eight
Monday.com1 of 30Not among the top eight
A head-to-head page exists where both products are among a category's top eight. The other rows are the same fact without a page behind them, so they link to the product instead.

What carried it into the answer

The sites and pages cited by the answers that named Oracle Primavera Cloud. A fact about retrieval, not a lever on the model.

Citations exist only for the models that return a source list, five of the fourteen in this edition, so these counts come from 2 of the 3 answers that named Oracle Primavera Cloud and are not a share of its labels.

Domains cited

apis.io1
bigtime.net1
capterra.com1
celoxis.com1
checkthat.ai1
clickup.com1
erpresearch.com1
forbes.com1
getmonetizely.com1
guideflow.com1

Ten of the ten domain citations in answers naming Oracle Primavera Cloud came from somebody else's page.

Pages cited

Pages are listed as the models cited them.

Names read as Oracle Primavera Cloud

What the judge wrote, as written, with how often. The vendor table decides that these count as Oracle Primavera Cloud; a claim can dispute any of them.
Oracle Primavera 1

Follow Oracle Primavera Cloud

An email the morning each edition publishes: where this product moved, where it held, and by how much against the noise floor. One address, confirmed by a click; a stop link in every email.

Already following? Everything you follow, with a stop for each.

The company

Oracle is the company behind Oracle Primavera Cloud.
ShowHide

In its own words

Stated by the vendor, not checked
Positioning
Oracle Primavera Cloud integrates planning, scheduling, and resource and risk management. It’s the industry’s only solution that combines CPM contract scheduling and task management in a single cloud environment.
Customers named
iterassystemclaycoswinerton
Not stated on the pages read
Price, starting price, free plan or trial, integrations, certifications, hosting

What Oracle Primavera Cloud's own pages state, read October 6, 2026: oracle.com/construction-engineering/primavera-p6, oracle.com/construction-engineering/primavera-analytics, oracle.com/construction-engineering/oracle-primavera-ashghal, oracle.com/construction-engineering/primavera-cloud-project-management, oracle.com/construction-engineering/oracle-primavera-cloud-portfolio-and-capital-planning. A claimed page can correct any of them.

Is this your product?

Claim this page

Claiming is free and changes nothing in the data. A claimed page shows a verified contact who is told when each edition publishes and when Oracle Primavera Cloud's standing changes by more than the noise floor; the right to propose corrections to the vendor table, meaning names the judge wrote that should or should not read as Oracle Primavera Cloud, applied by version and listed in the change log; and a one-line description supplied by the vendor and marked as such.

What a new claim receivesHide what a new claim receives

A new claim receives the current edition's vendor brief for Oracle Primavera Cloud by email, built from the raw record of the edition. It shows:

  • where Oracle Primavera Cloud is named, by buyer and by framing, and which cells hold its first choices;
  • the claims the models make when they name it, ranked, with the strongest and the weakest quoted;
  • its vocabulary against the segment leader's, and the pages the models cited;
  • who was chosen in the answers that did not name Oracle Primavera Cloud, and every reason the record gives;
  • a battlecard for each top rival: the head-to-head split, why they win, and the reservation quoted against them;
  • one page of published figures cleared to show a buyer.
The subscriber app

A verification link goes to your work email; an address at oracle.com is approved on the spot, any other is reviewed by hand. Your email is never published. Claiming gives no say over labels, shares, verdicts or which quotes appear.